Projects
University of Washington
- General contractor for natural gas infrastructure since 2011
- Managed system maintenance and capital improvements
- Delivered pipeline installations and coordinated inspections
- Ensured compliance with PHMSA and UTC regulations
- Maintained system integrity and regulatory alignment throughout all phases
- Installed Galvanic anode beds for cathodic protection on steel infrastructure.
Department of Transportation
- Replaced rooftop HVAC unit at end-of-life
- Removed existing unit and installed new RTU
- Replaced associated gas and electrical lines
- Verified code compliance for all new connections
- Managed permitting, inspections, and final commissioning
DSHS Fircrest Facility
- Installed 500 ft of 2” MDPE underground fuel line to new nursing facility
- Completed full leak survey across existing infrastructure
- Conducted abnormal operating conditions survey to assess system integrity
- Designed maintenance program to align natural gas system with DOT and UTC regulatory standards
- Identified system deficiencies and provided corrective recommendations
- Supported long-term compliance planning for facility-owned natural gas infrastructure
Cascade Natural Gas
- Third-party inspector for pipeline installation projects
- Provided documentation management and regulatory coordination
- Collaborated with municipalities and utility districts
- Designed system upgrades and replaced aging infrastructure
- Ensured compliance with PHMSA and UTC regulations in WA and OR
Privately Owned Condominiums
- Replaced aging gas piping and internal plumbing systems
- Upgraded boilers, furnaces, and water heaters
- Conducted inspections and resolved system inefficiencies
- Navigated permitting and coordinated with local jurisdictions
- Delivered tailored solutions with full regulatory compliance
Seattle Pacific University
- Long-term general contractor and project manager
- Oversaw pipeline installations, HVAC system upgrades, and equipment replacements
- Conducted leak surveys and monitored operating conditions
- Managed inspections and state-mandated reporting
- Ensured full compliance with PHMSA and UTC standards
- Installed Galvanic anode beds for cathodic protection on steel infrastructure
U.S. Coast Guard
- Evaluated and upgraded aging HVAC system
- Replaced outdated components to restore full functionality
- Delivered project with precision and adherence to safety standards
- Client satisfaction resulted in offer to serve as reference
Seattle Pacific University – ZEVAC Deployment for Pipeline Retirement and Commissioning
- Retired 1,500 ft of 4” steel pipeline and installed 350 ft of 2” MDPE
- Maintained uninterrupted gas service using CNG bottles during transition
- Used ZEVAC Mini to safely evacuate gas without atmospheric release
- Reduced line pressure from 10 psi to -12 psi in under 30 minutes
- Verified zero gas presence with SENSIT G-2 CGI before deactivation
- Commissioned new pipeline with controlled gas introduction and purging
- Achieved full compliance with CFR-49 Part 192 and PHMSA standards
WestRock Cardboard Manufacturing Facility
- Installed 500 ft of 4” MDPE underground natural gas pipeline to support new box production building
- Integrated large rotary smart meter for accurate fuel usage monitoring
- Coordinated closely with site operations to minimize disruption during installation
- Ensured full compliance with all applicable codes and utility standards
- Delivered a seamless infrastructure upgrade to support long-term performance, safety, and scalability
Various Privately Owned Resorts and Communities
- Replaced aging pipeline segments and expanded system capacity
- Integrated modern safety features into existing infrastructure
- Managed construction of system additions to support increased demand
- Resolved non-compliance issues related to operations manuals and operator qualification programs
- Coordinated directly with the Washington UTC to address regulatory concerns
- Handled all inspection scheduling, documentation, and regulatory coordination
- Ensured full compliance and long-term system reliability across all phases